[1]
M. S. G. D. S. B. K., “An Improved Bat Algorithm for the Hybrid Flowshop Scheduling to Minimize Total Job Completion Time”, ijfrcsce, vol. 4, no. 1, pp. 78–84, Jan. 2018.