, M. S. G. D. S. B. K. (2018) “An Improved Bat Algorithm for the Hybrid Flowshop Scheduling to Minimize Total Job Completion Time”, International Journal on Future Revolution in Computer Science & Communication Engineering, 4(1), pp. 78–84. Available at: http://ijfrcsce.org/index.php/ijfrcsce/article/view/968 (Accessed: 5May2024).