, M. S. G. D. S. B. K. (2018). An Improved Bat Algorithm for the Hybrid Flowshop Scheduling to Minimize Total Job Completion Time. International Journal on Future Revolution in Computer Science &Amp; Communication Engineering, 4(1), 78–84. Retrieved from http://ijfrcsce.org/index.php/ijfrcsce/article/view/968